Concrete & Mortar Calculator

Cement bags, sand, gravel and water for slabs, footings, columns and plaster, by volume mix or H class

🔒 Your data stays in your browser: nothing you type or upload is sent to a server.

How it works

Pick the shape and the volume is computed from your dimensions (a round column uses π r² × height). With a ratio such as 1:2:3 the loose volume of materials is about 1.54 times the concrete placed, shared out by the parts; cement is converted to kg with a typical loose density, then to bags. H-classes use a typical cement content and the absolute-volume method for sand and gravel. Water comes from the water/cement ratio.

Formula

cement (kg) = V × 1.54 × c / (c + s + g) × 1440 water (L) = cement kg × w/c

Common questions

Why 1.54?

Loose cement, sand and gravel pack together when mixed: the small grains fill the voids between the big ones, so about 1.54 m³ of dry materials make 1 m³ of placed concrete. It is an empirical value between 1.5 and 1.57; change it in the advanced options if your supplier gives another.

Related tools